Follow Cogent on FacebookFollow Cogent on Twitter
Process Engineering Maintenance – NOS Review
Cogent are nearing the completion of the review of the Process Engineering Maintenance (PEM) suite of National Occupational Standards (NOS). This periodic review ensures that the NOS remain ‘fit-for-purpose’ and continue to meet the needs of industry.

It has been found that only minor changes have been necessary to the NOS and that they are still relevant to the industries that use them.
Please click here to view a summary of the changes, which concern the knowledge needed to select and use tools and equipment safely.

The full suite of amended NOS can be found below.

L2 NVQ Certificate in Process Engineering Maintenance Mandatory Units for All Pathways
C2.1 - Reinstate the Work Area after Completing the Maintenance of Process Plant and Equipment  C2.2 - Handover Process Plant and Equipment C2.3 - Deal with Hazards 
C2.4 - Contribute to Effective Working Relationships within Process Engineering Maintenance


L3 NVQ Diploma in Process Engineering Maintenance Mandatory Units for All Pathways
C3.1 - Handover Process Plant and Equipment C3.2 - Reinstate the Work Area after Completing the Maintenance of Process Engineering Plant and Equipment C3.3 - Minimise Risks to Life, Property and the Environment C3.4 - Work Safely, Minimise Risk & Comply with Emergency Procedures  C2.4 - Contribute to Effective Working Relationships


All NOS for Process Engineering Maintenance

 
Unit C2.1 - Reinstate the Work Area after Completing the Maintenance of Process Plant and Equipment
Unit C2.2 - Hand Over Process Plant and Equipment
 Unit C2.3 - Deal with Hazards  Unit C2.4 - Contribute to Effective Working Relationships in Process Engineering Maintenance  Unit C2.5 - Prepare Work Areas for the Maintenance of Process Plant and Equipment  Unit C2.6 - Prepare Loads for Moving  Unit C2.7 - Move Loads
Unit C3.1 - Hand Over Process Engineering Plant and Equipment
 Unit C3.2 - Reinstate the Work Area  Unit C3.3 - Minimise Risks to Life, Property and the Environment  Unit C3.4 - Work Safely, Minimise Risk and Comply with Emergency Procedures  Unit C3.5 - Contribute to Effective Working Relationships
 Unit C3.6 - Prepare Work Areas for the Maintenance of Process Engineering Plant and Equipment  Unit E2.1 - Carry Out Planned Maintenance Procedures on Electrical Process Plant and Equipment  Unit E2.2 - Prepare Materials for the Maintenance of Electrical Process Plant and Equipment  Unit E2.3 - Prepare Process Plant and Equipment in Support of Electrical Engineering Activities  Unit E2.4 - Assemble Components of Electrical Process Plant and Equipment
 Unit E2.5 - Remove Components from Electrical Process Plant and Equipment  Unit E2.6 - Replace Components in Electrical Process Plant and Equipment  Unit E3.1 - Carry out Planned Maintenance Procedures on Electrical Plant and Equipment  Unit E3.2 - Deal with Variations and Defects in Electrical Plant and Equipment  Unit E3.3 - Diagnose and Determine the Causes of Faults in Electrical Plant and Equipment
 Unit E3.4 - Prepare Equipment in Support of Electrical Engineering Activities  Unit E3.5 - Prepare Materials for the Maintenance of Electrical Plant and Equipment  Unit E3.6 - Adjust Electrical Plant and Equipment to meet Operational Requirements  Unit E3.7 - Remove Components from Electrical Plant and Equipment  Unit E3.8 - Replace Components in Electrical Plant and Equipment
 Unit E3.9 - Determine the Feasibility of Repair of Components from Electrical Plant and Equipment  Unit E3.10 - Interpret Detailed Electrical Information from Technical Sources  Unit E3.11 - Read and Extract Information from Electrical Engineering Drawing and Specifications  Unit E3.12 - Identify and Suggest Improvements to Working Practices and Procedures  Unit E3.13 - Establish that an Electrical Engineering Process has been Completed to Specification
 Unit E3.14 - Test the Performance and Condition of Electrical Plant and Equipment  Unit E3.15 - Monitor the Performance and Condition of Electrical Plant and Equipment  Unit E3.16 - Assess the Performance and Condition of Electrical Plant and Equipment  Unit E3.17 - Inspect Electrical Plant and Equipment  Unit I2.1 - Carry Out Planned Maintenance Procedures on Instrument and Control Plant and Equipment
 Unit I2.2 - Prepare Materials for the Maintenance of Instrument and Control Process Plant and Equipment  Unit I2.3 - Prepare Process Plant and Equipment in Support of Instrument and Control Engineering Activities  Unit I2.4 - Assemble Components of Instrument and Control Process Plant and Equipment  Unit I2.5 - Remove Components from Instrument and Control Process Plant and Equipment  Unit I2.6 - Replace Components in Instrument and Control Process Plant and Equipment
 Unit I3.1 - Carry Out Planned Maintenance Procedures on Instrument and Control Systems  Unit I3.2 - Deal with Variations and Defects in Instrument and Control Systems  Unit I3.3 - Diagnose and Determine the Causes of Faults in Instrument and Control Systems  Unit I3.4 - Prepare Equipment Required for Maintaining Instrument and Control Systems  Unit I3.5 - Prepare Materials Required for Maintaining Instrument and Control Systems
 Unit I3.6 - Adjust Instrument and Control Systems to meet Operational Requirements  Unit I3.7 - Remove Components from Instrument and Control Systems  Unit I3.8 - Replace Components in Instrument and Control Systems  Unit I3.9 - Determine the Feasibility of Repair of Components from Instrument and Control Systems  Unit I3.10 - Interpret Detailed Instrument and Control Information from Technical Sources
 Unit I3.11 - Read and Extract Information from Instrument and Control Engineering Drawings and Specifications  Unit I3.12 - Identify and Suggest Improvements to Working Practices and Procedures  Unit I3.13 - Establish that an Engineering Maintenance Process has been Completed to Specification  Unit I3.14 - Test the Performance and Condition of Instrument and Control Systems  Unit I3.15 - Monitor the Performance and Condition of Instrument and Control Systems
 Unit I3.16 - Assess the Performance and Condition of Instrument and Control Systems  Unit I3.17 - Inspect Instrument and Control Systems  Unit M2.1 - Carry Out Planned Maintenance Procedures on Mechanical Process Plant and Equipment  Unit M2.2 - Prepare Materials for the Maintenance of Mechanical Process Plant and Equipment  Unit M2.3 - Prepare Process Plant and Equipment in Support of Mechanical Engineering Activities
 Unit M2.4 - Assemble Components of Mechanical Process Plant and Equipment  Unit M2.5 - Remove Components from Mechanical Process Plant and Equipment  Unit M2.6 - Replace Components in Mechanical Process Plant and Equipment  Unit M3.1 - Carry Out Planned Maintenance Procedures on Mechanical Plant and Equipment  Unit M3.2 - Deal with Variations and Defects in Mechanical Plant and Equipment
 Unit M3.3 - Diagnose and Determine the Causes of Faults in Mechanical Plant and Equipment  Unit M3.4 - Prepare Activities in Support of Engineering Activities  Unit M3.5 - Prepare Materials for the Maintenance of Mechanical Plant and Equipment  Unit M3.6 - Adjust Mechanical Plant and Equipment to Meet Operational Requirements  Unit M3.7 - Remove Components from Mechanical Plant Equipment
 Unit M3.8 - Replace Components in Mechanical Plant and Equipment  Unit M3.9 - Determine the Feasibility of Repair of Components from Mechanical Plant and Equipment  Unit M3.10 - Interpret Detailed Mechanical Information from Technical Sources Unit M3.11 - Read and Extract Information from Mechanical Engineering Drawings and Specifications
 Unit M3.12 - Identify and Suggest Improvements to Working Practices and Procedures
 Unit M3.13 - Establish that an Engineering Maintenance Process has been Completed to Specification  Unit M3.14 - Test the Performance and Condition of Mechanical Plant and Equipment  Unit M3.15 - Monitor the Performance and Condition of Mechanical Plant and Equipment  Unit M3.16 - Assess the Performance and Condition of Mechanical Plant and Equipment Unit M3.17 - Inspect Mechanical Plant and Equipment





Return to Previous Page       Top of Page      Text Only Version

Explore the rest of our site...